Place of construction
Jaroměř
Investor
Realization
10/2018 - 02/2019
General contractor
STEEL & HALL s.r.o.
Usable area
872 m²
The need to store plastic products forced GUMOTEX to build this warehouse in its production area on the outskirts of the center of Jaroměř. A sufficiently load-bearing paved surface was used to anchor the hall. The hall is designed for continuous operation, so it has an open longer wall towards the production and flow of material. The hall consists of a steel structure with lattice girders. The casing consists of a PVC membrane in the basic white design.